2025 스마트팜 코리아

KOR

Exhibitors

Information on Booth Application
2024 Smart Farm Korea provides only an ‘area’, basically when you apply for participation.​ If you need a booth, it is required to select a separate option. For more details about a selectable booth, you can get information on the bottom.
Version​ Cost​ Select options​ Note​
Application for participation​
(area​)
$ 2,300
(VAT excluded)​
- Only an area (3m*3m) is offered.​
- In case of solo application, it is required to request at least two booths.​
- A participant should install and pull down exhibition booth(s) directly.​
- In case of device construction, its design drawing should be submitted to Exhibition  Office; construction should begin after an approval is received.​
- Electricity is not offered. It is required to apply for electricity separately.​
Basic booth​​
(Octanium​)
$ 2,700
(VAT excluded)​
- standard​ 3m*3m*2.5m(h)
- Mutual signage​
Wood Panel Booth​ $ 3,500
(VAT excluded)​
- standard​ 3m*3m*2.5m(h)
- Mutual signage​
Block Booth​ Different Booth Design & Size​

Check booth type and options

 


Booth Guide​

Rental items

For equipment rental, you can apply individually to the partner company "Exco Promotion (051-740-7718)", not the secretariat.

Additional options​ Different Option​ Additional DisplayInfodesk, etc.​
Application (area) Basic booth(Octanium) Wood Panel Booth Block Booth Additional options
Division​ Application​
(area​)
Cost​ $ 2,300
(VAT excluded)​
Select options​
Note​ - Only an area​​ (3m*3m)
- In case of solo application, it is required to request at least two booths.​
- A participant should install and pull down exhibition booth(s) directly.​
- In case of device construction, its design drawing should be submitted to Exhibition Office; construction should begin after an approval is received.​
- Electricity is not offered. It is required to apply for electricity separately.​
Additional Facilities Application Guide
Division​ Cost(VAT excluded)​ Note​
Electricity​ Basic use
​(09:00~18:00)
Phase 220V $50 /KW - If other electric power is needed, apply in KW units​
- Independent booths do not provide basic power, so you must apply for more than 1KW.​
- This amount is the installation fee and usage fee, and it is the amount that can be used during the exhibition period without separate settlement.​
Three phase 220V
Three phase 380V
Sockets in independent booths $30 /KW
24hours​ $60 /KW
Telephone​ Domestic​ $50 /KW
International​ $150 /KW
Internet LAN​ $150 /Port
​Water Supply and Drainage​ $200 /ea​
Compressed Air​ $200 /ea​
Gas​ $500 /ea​
Division​ Cost(VAT excluded)​
Electricity​ Basic use
​(09:00~18:00)
Phase 220V $50 /KW
Three phase 220V
Three phase 380V
24hours​ $60 /KW
Sockets in independent booths $30 /KW
Telephone​ Domestic​ $50 /KW
International​ $150 /KW
Internet LAN​ $150 /Port
Water and Drainage​ $170 /ea​
compressed air​ $170 /ea​
Gas​ $500 /ea​
Note​ - If other electric power is needed, apply in KW units​
- Independent booths do not provide basic power, so you must apply for more than 1KW.​
- This amount is the installation fee and usage fee, and it is the amount that can be used during the exhibition period without separate settlement.​
Main schedule
  • 01

    Deadline for participation application

    When the booth runs out,
    the application is closed

  • 02

    Booth equipment construction

    25.05.19-20
    (2days)

  • 03

    Bringing in exhibits

    25.05.20
    (1days)

  • 04

    Holding an exhibition

    25.05.21-23
    (3 days)

  • 05

    Carrying out and dismantling of exhibits

    25.05.23
    (Same-day demolition)

Participation application and payment
Application​

Fill in the E-contract (participation application form) form

  * It is possible to write and submit the form more conveniently through PC and mobile (KAKAO TALK, text message).

 

Apply for participation online at the website.

 

Required Documents​ Application form, Business license​
Submit application form​ Payment of the application fee (50% of the participation fee) should be made within 1 week after submitting the application.​
Payment of participation fee​ Bank : SHINHAN BANK
Account No : 110-545-992428
Account Holder : EunJungPark
SWIFT Code : SHBKKRSE
Bank Address : 9, Centum dong-ro, Haeundae-gu, Busan, Republic of Korea
Bank Telephone : +82-51-744-6072
※ Deadline to full payment​ : May 02th, 2025
※ When transferring participation fee, the account name has to be same with the company name.​